Pole attachment audit & joint-use survey services

Accurate, field-verified attachment data — measured clearances, NESC and make-ready flags, and clean GIS deliverables your team and every attacher can trust.

Aerial pole-to-pole fiber design showing attachments across a joint-use pole line

A pole line only stays safe, compliant, and billable when the record matches the field. Over time, attachments get added without permits, clearances drift out of NESC compliance, and the pole owner's database no longer reflects what is actually in the air. A pole attachment audit puts the record straight — capturing every attachment on every pole, measuring the clearances, and flagging what needs attention.

ODD performs joint-use audits and attachment surveys for pole owners, utilities, municipalities, and the ISPs and contractors who attach to their poles. The work is led directly by a senior engineer with hands-on pole-data verification experience from Google Fiber CAS-P fiber deployments — so the data you get back is field-accurate, defensible, and ready to act on.

Audit deliverables

Full attachment inventory per pole — owner and every attacher
Measured attachment heights and clearances
NESC clearance-violation identification
Make-ready conditions flagged and documented
Geo-referenced field photos per pole
GPS-located, field-verified pole data
GIS deliverables — KMZ, KML, shapefile, or ESRI geodatabase
Optional ArcGIS dashboard for owner and attacher review
Owner-vs-attacher reconciliation for joint-use billing

A four-phase methodology

Who ODD audits for

Pole owners & electric utilities
Municipal utilities & broadband programs
ISPs & communications attachers
Broadband grant subrecipients
Fiber contractors & construction primes
Electric cooperatives

Why owners bring ODD in

Common questions

What is included in a pole attachment audit?

A full field inventory of every attachment on each pole — the pole owner plus every communications attacher — with measured attachment heights and clearances, geo-referenced photos, GPS-located pole data, identification of NESC clearance violations, and make-ready conditions flagged for follow-up. Results are delivered as GIS layers and, on request, an interactive dashboard.

Do you provide NESC clearance and make-ready analysis?

Yes. Measured clearances are checked against NESC and owner construction standards, clearance violations are identified, and make-ready conditions are flagged and documented. Structural pole-loading analysis that requires the owner's loading platform is coordinated with the pole owner's engineer of record.

What deliverable formats do you provide?

GIS deliverables aligned to your standard — KMZ, KML, shapefile, or an ESRI geodatabase — plus geo-referenced field photos and a tabular attachment inventory. An ArcGIS dashboard can be provided so pole owners and attachers can review and interact with the audit data.

Can the audit support joint-use billing reconciliation?

Yes. The audit reconciles the field-verified attachment inventory against the pole owner's records, surfacing unpermitted or unbilled attachments so the owner can recover revenue and correct the joint-use record.

Is ODD certified, and what areas do you serve?

ODD is an SBA-certified Women-Owned Small Business (WOSB) and Economically Disadvantaged Women-Owned Small Business (EDWOSB), active in SAM.gov and on the Texas CMBL. Service is nationwide, based in Lewisville, TX.

Need an accurate pole line — and a record you can defend?

Tell me the pole count and the goal — compliance, billing recovery, or a build. I'll walk you through scope, timeline, and deliverables.

Book a 30-minute consultation →